Records at Construction Site
The following are the various records that need to be maintained at the construction site,
1. Drawings
First and foremost import records to be maintained on-site are the working drawings approved by the clients and design engineer, based on which all the construction activities take place on-site. There are a different type of drawings required for construction, some of the basic required drawings are,
Architectural drawing
Structural drawing
Plumbing & sanitary drawing
Electrical drawing
Finishing drawing etc.
2. Contract Agreement
Contract agreement documents including all sets of drawings, including amendments, a copy of the approval of municipality, corporation or urban development authorities need to be maintained at construction sites till the completion of construction projects. These documents provide permission and guidelines for all the activities carried out at the construction site.
3. Time and Progress Charts or CPM Charts
These charts help in tracking the construction activities from time to time and help in effective planning, scheduling and controlling the construction projects activities. These charts need to be approved by the concerned authorities.
4. Work Orders Book
All the orders given by clients to the contractors need to be maintained with serial numbers, signatures, and dates. These orders should be specific for works. This order should also have a compliance column.
5. Works Diary
Works diary of a construction project should indicate contract agreement number, name of work, amount of contract, date of commencement of work, date of completion and extension time granted.
All the relevant details need to be entered daily in the works diary. This diary serves as an authentic record. Following details need to be entered in this diary with due care:
Weather at site
Important materials brought to the site with their approximate quantity
Types of transport working at the site
Types of tools and plants being used at the site
Important items of works completed and passed on the particular date
Visits of VIPs and their remarks if any.
6. Works Passing Records
This record maintains all the activities to be carried out at the construction site. It consists of an index page with details of all items of works to be done under the contract and other pages with details of the progress of each work. This helps in tracking the progress of each activity of construction and helps in pre-planning for other remaining activities which start after completion of current activity. This also helps in acquiring approvals before the time for activities to be started.
7. Tests Results Record
This is an important record to be maintained at the construction site as a proof for construction quality. This record consists of tests of various materials such as cement, sand, aggregates, water, steel reinforcement used at a construction site, test records of concrete cubes, concrete cylinders, slump tests, etc.
These records are arranged as an index page with details of each material, page numbers of records, etc. Individual pages consist of each material, with their test dates, results, etc.
All the tests carried out at the site or in the laboratory are recorded in this record book. Some of the tests carried out at construction sites for civil works are:
Cube tests for concrete work for each location or structural members.
Sieve analysis of coarse aggregates, impact or abrasion tests.
Sieve analysis of coarse sand for concrete works, masonry sands for masonry works, plastering and pointing works, etc.
Tests for impurities of aggregates and sands.
Bulking of sand test for concrete and masonry works.
8. Cement Register
This record is maintained with details of receipts, daily consumptions and the remaining balance of cement at site. This record also consists of manufacturing dates of cement, date of receipt and test reports of cement at site or manufacturers test reports.
9. Register for Approval of Samples
This record provides details of all the samples for construction materials that have been approved or rejected by the clients. Approvals from the client is necessary for the construction materials to be used before the commencement of the project. All the samples approved by the clients need to be kept separately along with their tests reports with approvals of the clients and contractors till the completion of the work.
10. Records of Changes, Deviation Orders and Amendments
Many times during the construction projects, there are deviations or changes or amendments to the contract documents and work activities from time to time during construction project as required by the clients. These changes can be in a drawing, specifications or additional works.
A record of all such deviation orders and amendments to contract agreement together with their financial effect should be maintained along with approval or signatures from the clients. If these changes involve in any extension of time of the contract, these should also be recorded.
11. Measurement Books
The measurement book is a record for all the construction activities carried out and approved by the client. These records are important for a contractor to maintain and help during billing claims. Any extra work done is also recorded in this book with notes.
12. Labour Attendance Record and Daily Wages Sheet
Generally, for labor contractor payments, daily or every shift attendance record is kept. Apart from the above, technical staff attendance, engineers, supervisors, and peon attendance register is kept.
13. Periodic Bills Record
Bills on work till date from the previous bill and work checked by engineer-in-charge put up for the payment.